Skip To Main Content

header-container

Breadcrumb

2023 November Bond Proposal

White and yellow text over blue background reads 2023 bond proposal, thank you for your support!

Our Vision

The front of East Grand Rapids High School. 

High school transformation

The bond proposal would fund additions and renovations to EGRHS, with an emphasis on academic spaces including:

  • Multi-story building addition & extensive renovations
  • Right-sized classrooms featuring natural light and flexible design elements
  • STEAM spaces designed to promote innovative and engaging educational experiences
Students on Playground

student-centered

Projects that were identified during an 18-month planning process alongside students, staff, and the community include:

  • Design changes that promote health, safety, and sustainability
  • Enhancements to the Performing Arts Center
  • Upgrades to athletic facilities
  • New co-curricular spaces for Robotics, Science Olympiad, and other academic clubs
Boiler Room pipes

every building impacted

Every building would receive improvements that support healthy learning and the well-being of students.

Early Childhood Center
The bond would fund a multi-classroom addition to Woodcliff Early Childhood Center to meet current and future needs.

HVAC & Plumbing
Upgrades to mechanical, electrical, and plumbing systems would improve student comfort and health, air quality, and operational efficiency in every building.

10-Year Technology
The bond would fund new instructional technology in every building over the next ten years.


Current Project: Woodcliff Early Childhood Center

Building under construction with gray blocks and wood beams
Preschool students looking out a window watching a crane do construction work
Preschool students looking out a window watching construction work

Renderings courtesy of Pure Architects

Pre-Election Media

Bond News Updates

Preschool students looking out a window watching a crane do construction work

Our littlest learners had a front row seat to the construction happening at Woodcliff Early Childhood Center. 

  • 2023 Bond
  • District
  • WECC
November 2023 Bond Proposal - Thank You for Your Support

Thank you, East Grand Rapids community, for your support passing the November 2023 bond proposal!

  • 2023 Bond
  • District

Historical FAQs